Viksit Gujarat Industrial Policy 2026 · 1 June 2026 to 31 May 2031

Choose your incentive basket.

Capital subsidy, interest subsidy and power tariff support, combined up to a ceiling set by your unit size and taluka. Bhavnagar is Category B. Run your own numbers below.

Calculator

01

Your numbers, the published percentages.

Updates as you drag
Drag me

Indicative basket

Live

Capital subsidy
Interest subsidy
Power tariff support
EPF reimbursement, outside the ceiling

Take these numbers with you.

A branded PDF built from the inputs above, with the workings, the timing and the sources.

Arithmetic on the published percentages, for planning only. Interest subsidy assumes the loan is fully drawn; power support assumes flat consumption; EPF uses the ₹1,800 per employee per month cap. Eligibility and the final quantum are the Government of Gujarat’s to determine.

Please verify before you rely on this. These figures are an indicative calculation, not advice and not an offer, and may contain errors. Check every number against the current government notification and with your own consultant before you commit. Shivanand Land Development Corp. accepts no liability for any decision taken on the basis of this calculator.

The honest number

Category B. Up to 35%, not 45%.

The Government Resolution of 8 September 2026 classifies 130 talukas as Category A and 138 as Category B. Bhavnagar taluka, where the park sits, is Category B. Ghogha, Vallabhipur, Umrala, Talaja, Palitana, Gariadhar and Jesar in the same district are Category A. Some sellers will quote you the Category A headline; we would rather you knew the difference before the visit.

What Category B does not change: the 7% interest rate itself, the 100% EPF reimbursement, the electricity-duty exemption, the thrust-sector list, and the five-year policy window. What it does change is the capital rate, the overall ceiling, the power rate per unit, and the caps on interest and power support. What it does change is the capital-subsidy rate and the power support per unit, and the calculator above already accounts for both.

ComponentCategory ACategory B
MSME capital subsidy35% of eFCI25% of eFCI
MSME overall ceiling45%35%
MSME power tariff₹2 per unit · 5 yrs₹1 per unit · 5 yrs
Interest subsidy rate7% p.a.same
Large, thrust sector ceiling35%25%
Large thrust, interest & power cap20% each15% each
Mega ceiling35%30%
Selected thrust ceiling50%45%
EPF reimbursement100%100%
Electricity dutyexemptexempt

Every band

03

Micro to ultra-mega, A and B side by side.

The rate is 7% a year in every band, but the cap on it, the cap on power support and the number of years all change with the band. Bold figures are the ones that apply at the park. Read from the Industries Commissionerate’s own policy document.

On top of the basket

Reliefs that stack.

Sixteen thrust sectors, five selected

Build inside a category the policy is written to favour.

For a large unit in Bhavnagar, thrust-sector status is the difference between a 25% ceiling and a 15% one. Five of the sectors carry a higher special provision again, marked with a star. Highlighted on the left are the listed sectors with a natural home on this coast: shipping containers, vehicle scrapping, heavy earth moving equipment, minerals and ceramics, agro and food processing, chemicals, battery storage and renewable energy equipment. We highlight only what the Government actually lists.

The full list

Sources

Read the policy, not our summary of it.

We keep this page aligned to the published documents. If a figure here disagrees with the policy text or a later resolution, the government document wins, and we would like to hear about it.